Tata Nexon EV MAX Charging Near Hubli–Dharwad
Hubli–Dharwad, Karnataka
No compatible stations found in Hubli–Dharwad. Showing 20 nearby compatible stations within 50km radius.

Range437 km
Battery40.5 kWh
Max DC Charging50kW
Avg. Charging Time39 min
20
Nearby Compatible
20
Operational
20
Fast Charging
7
Operators
Compatible Stations Near Hubli–Dharwad
Charging Options for Tata Nexon EV MAX
CCS2
DC Fast ChargingMax: 50 kW20 stations
Type 2 AC
AC ChargingMax: 7.2 kW0 stations
Nearby Compatible Stations
Mahaveer Ventures Hotel and Resort - The Padival Grand
OperationalMahaveer Mall, Main Road • Puttur
Compatible Connectors:
CCS (Type 2) (24kW)Type 2 (Tethered Connector) (22kW)
DC Fast: 24kW(1h 11m)
AC: 22kW(1h 17m)
Zeon Charging
Sowmya Fuel Station
OperationalSy no 3, Hosur Road • Attibele
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(57 min)
Tata Power
21/kWh
Electronic City - BPCL
OperationalHosur Road, Konappana Agrahara • Bengaluru
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(57 min)
Statiq (IN)
Monk Mansion
Operational89, Neeladri Nagar • Bengaluru
Compatible Connectors:
CCS (Type 2) (60kW)CCS (Type 2) (60kW)
DC Fast: 60kW(28 min)
Statiq (IN)
14.99/kWh
BloomSuites
OperationalNo. 5-56/A, Wipro Avenue, opp. Wipro Gate, Electronics City Phase 1 • Bengaluru
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(57 min)
Tata Power
21/kWh
Hotel Masala Suruchi
OperationalNH - 75 • Marur Handpost
Compatible Connectors:
CCS (Type 2) (60kW)
DC Fast: 60kW(28 min)
JIO BP Pulse (India)
20/kWh
Pearl EV Fast charger
Operational12/10-97-91, Ward 31 • Raichur
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(57 min)
(Unknown Operator)
22/kWh
SLV Hotel & Family Restaurant
OperationalChittapur Road • Yadgir
Compatible Connectors:
CCS (Type 2) (30kW)Type 2 (Tethered Connector) (7kW)
DC Fast: 30kW(57 min)
(Unknown Operator)
22/kWh
New Sangeeta Gardens Family Restaurant
OperationalNH - 50, Vijayapura - Gulbarga Roa • Sindgi Rural
Compatible Connectors:
CCS (Type 2) (60kW)
DC Fast: 60kW(28 min)
Statiq (IN)
14.99/kWh
Sri Nisty Pvt
OperationalNandoor K • Kalaburgi
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(57 min)
Tata Power
21/kWh
Punjabi Dhami Hotel
OperationalNH - 65, Mumbai Highway • Sastapur
Compatible Connectors:
CCS (Type 2) (30kW)CCS (Type 2) (30kW)
DC Fast: 30kW(57 min)
Chargezone (India)
15/kWh
Hotel BHP-6
OperationalOpp Noor Dhaba, PYC Road, NH - 65 • Humnabad
Compatible Connectors:
CCS (Type 2) (60kW)
DC Fast: 60kW(28 min)
Statiq (IN)
14.99/kWh
MR Residency
OperationalM R Residency, Near APMC Bypass • Hungund
Compatible Connectors:
CCS (Type 2) (60kW)
DC Fast: 60kW(28 min)
Statiq (IN)
14.99/kWh
Hotel Poorvi
OperationalNH - 50 • Uppaldinni
Compatible Connectors:
CCS (Type 2) (60kW)
DC Fast: 60kW(28 min)
Statiq (IN)
14.99/kWh
BPCL Bagalkote
OperationalMurnala Village • Bagalkote
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(57 min)
(Unknown Operator)
14/kWh
Jio-BP Mobility Station PD Halli
OperationalSy No.44(P), NH - 67 • Hagari
Compatible Connectors:
CCS (Type 2) (60kW)
DC Fast: 60kW(28 min)
JIO BP Pulse (India)
20/kWh
Mahindra Bellary Motors
OperationalNH 63, Bellary - Uravakonda - Anantapur Road • Ballari
Compatible Connectors:
CCS (Type 2) (60kW)
DC Fast: 60kW(28 min)
Statiq (IN)
14.99/kWh
Bellad Enterprises Pvt Ltd
OperationalHosapete Road • Ballari
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(57 min)
Tata Power
21/kWh
Miracle Dhaba
OperationalNear Vishwashanthi Ashrama, Nelamangala, NH - 48, Tumkur Road • Bengaluru
Compatible Connectors:
CCS (Type 2) (60kW)
DC Fast: 60kW(28 min)
Adani Gas-EV (TR)
19/kWh
Lithium Charging Station
Operational820, 2nd A Cross Rd, HRBR Layout 1st Block • Bengaluru
Compatible Connectors:
CCS (Type 2) (30kW)
DC Fast: 30kW(57 min)
(Unknown Operator)
Other Cities in Karnataka
Tata Nexon EV MAX Key Features
10.25-inch Infotainment
JBL Premium Audio
Wireless Phone Charger
iRA Connected Features