EV charging station · Mannaekhelli, Karnataka
At a glance
- Max power
- 90 kW
- Charging points
- 1
- Connector types
- 2
- Pricing
- 21/kWh
Connectors
CCS (Type 2)IEC 62196-3 Configuration FF
90 kWDC×2Level 3: High (Over 40kW)
CCS (Type 2)IEC 62196-3 Configuration FF
30 kWDC×1Level 3: High (Over 40kW)
Estimated charging time here
Approximate times at this station's top speed of 90 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.
| EV | Battery | Charge | Est. time |
|---|---|---|---|
| Tata Tiago EV | 24 kWh | 10–80% | 12 min |
| Tata Nexon EV | 40.5 kWh | 10–80% | 21 min |
| MG ZS EV | 50.3 kWh | 10–80% | 26 min |
| Hyundai Ioniq 5 | 72.6 kWh | 10–80% | 38 min |
Location
Loading map…
FAQ
What connectors does Hotel 24 have?
Hotel 24 offers CCS (Type 2), CCS (Type 2), with a maximum charging speed of 90 kW. Check your EV's connector type for compatibility before visiting.
Is Hotel 24 a fast charger?
Yes. With up to 90 kW of DC Fast DC charging, it can add significant range in 30–60 minutes for most EVs.
How much does charging cost at Hotel 24?
Pricing at this station: 21/kWh. Confirm current rates with the operator before charging.
Where is Hotel 24 located?
It's located at NH - 65, near Mangalgi tollgate, Mannaekhelli, Karnataka , 585227. Use the "Get directions" button for turn-by-turn navigation.