EV charging station · Bengaluru, Karnataka
At a glance
- Max power
- 25 kW
- Charging points
- 1
- Connector types
- 2
- Pricing
- 21/kWh
Connectors
Estimated charging time here
Approximate times at this station's top speed of 25 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.
| EV | Battery | Charge | Est. time |
|---|---|---|---|
| Tata Tiago EV | 24 kWh | 10–80% | 45 min |
| Tata Nexon EV | 40.5 kWh | 10–80% | 1.3 hr |
| MG ZS EV | 50.3 kWh | 10–80% | 1.6 hr |
| Hyundai Ioniq 5 | 72.6 kWh | 10–80% | 2.3 hr |
Location
FAQ
What connectors does Key Motors, Kanakapura Main Road have?
Key Motors, Kanakapura Main Road offers CCS (Type 2), CHAdeMO, with a maximum charging speed of 25 kW. Check your EV's connector type for compatibility before visiting.
Is Key Motors, Kanakapura Main Road a fast charger?
Yes. With up to 25 kW of DC Fast DC charging, it can add significant range in 30–60 minutes for most EVs.
How much does charging cost at Key Motors, Kanakapura Main Road?
Pricing at this station: 21/kWh. Confirm current rates with the operator before charging.
Where is Key Motors, Kanakapura Main Road located?
It's located at No 71, 1A & 71/7, Kanakapura Main Road, opposite Gopalan Temple Trees Apartment, Bengaluru, Karnataka , 560078. Use the "Get directions" button for turn-by-turn navigation.