EV charging station · Thrissur, Kerala
At a glance
- Max power
- 60 kW
- Charging points
- 2
- Connector types
- 1
- Pricing
- 24.78/kWh
Connectors
CCS (Type 2)IEC 62196-3 Configuration FF
60 kWDC×2Level 3: High (Over 40kW)
Estimated charging time here
Approximate times at this station's top speed of 60 kW for popular Indian EVs. Real-world times vary with battery temperature, state of charge, and the vehicle's onboard charging limit.
| EV | Battery | Charge | Est. time |
|---|---|---|---|
| Tata Tiago EV | 24 kWh | 10–80% | 19 min |
| Tata Nexon EV | 40.5 kWh | 10–80% | 31 min |
| MG ZS EV | 50.3 kWh | 10–80% | 39 min |
| Hyundai Ioniq 5 | 72.6 kWh | 10–80% | 56 min |
Location
Loading map…
FAQ
What connectors does Tata.ev Hyson Motors - Tata Power have?
Tata.ev Hyson Motors - Tata Power offers CCS (Type 2), with a maximum charging speed of 60 kW. Check your EV's connector type for compatibility before visiting.
Is Tata.ev Hyson Motors - Tata Power a fast charger?
Yes. With up to 60 kW of DC Fast DC charging, it can add significant range in 30–60 minutes for most EVs.
How much does charging cost at Tata.ev Hyson Motors - Tata Power?
Pricing at this station: 24.78/kWh. Confirm current rates with the operator before charging.
Where is Tata.ev Hyson Motors - Tata Power located?
It's located at NH 544, Thrissur, Kerala, 680014. Use the "Get directions" button for turn-by-turn navigation.